Load factor, weekly

The weekly load factor is the ratio between the average power (the energy supplied to the system) and the maximum average daily demand in a period of 7 days.

The weekly load factor is available for buried cables and can be changed between 0.5 and 1.0. If set to 1.0, it has no influence on the other load factors (daily and yearly, if applicable).

For more information, refer to the load factor $LF$.

Symbol
$LF_w$
Unit
p.u.

Default
1.0