Posted on 2016-06-26
Phase splitting can be used to drastically reduce the magnetic fields of buried power cables. Also, the conductor cross-section can be less than half because the current is only half per split...
Posted on 2016-02-22
Cableizer calculates the magnetic fields of multiple systems with different frequencies and load-flow directions. The magnetic field strength is diagrammed as impressive and meaningful...
Posted on 2015-11-02
The method described in the IEC 60287 standard to calculate buried cables where partial drying-out of the soil occurs is limited to a single isolated cable or circuit only. Cableizer introduced a...