2019 archive

Solving for outer temperature
Solving for outer temperature

Posted on 2019-11-27
In addition to solving your systems for a given maximum conductor temperature or conductor current, it is now also possible to directly calculate a cable system for a given maximum outer temperature.

Cable design limitations
Cable design limitations

Posted on 2019-10-17
In order to assist the user, we are limiting some cable configurations that do not conform to the standards or common practice.

Validation of emergency rating calculations acc. IEC 60853-2
Validation of emergency rating calculations acc. IEC 60853-2

Posted on 2019-10-01
The emergency rating calculations have now been updated and validated according to IEC standard 60853-2.

Increased safety and privacy
Increased safety and privacy

Posted on 2019-09-20
These last days we have further increased the safety of the Cableizer web application. We have also decided to remove Google Analytics in order to increase your personal privacy.

Updated method for electrical resistance input of conductor
Updated method for electrical resistance input of conductor

Posted on 2019-08-23
The electrical resistance of cable conductors can now be modelled in the cable editor in three different ways to better illustrate how the value is calculated / provided.

German reports
German reports

Posted on 2019-07-29
Calculation reports can now automatically be generated in German. All 784 parameter names in the documentation have also been translated into German.

Jicable'19 in Paris
Jicable'19 in Paris

Posted on 2019-04-12
Cableizer is participating at the Jicable conference in Paris Versailles 23-27 June 2019, where we will present the latest developments on our online cable optimizer software.

Updated methods for cyclic loading calculations
Updated methods for cyclic loading calculations

Posted on 2019-04-12
The following updates and improvements have been recently implemented for cyclic loading calculations: The load factor was limited to values of above 0.5, the influence of mutual heating from...

Cable Rating Calculations for Ground-Mounted Photovoltaic Power Plants
Cable Rating Calculations for Ground-Mounted Photovoltaic Power Plants

Posted on 2019-03-13
With the increasing number and scale of photovoltaic power plants and their cyclic nature of power generation, accurate cable rating calculations become essential in order to optimize their...