Posted on 2018-02-28
With the help of Cableizer, you can prevent problems by calculating the maximum allowable pulling tension for any installation. You can easily model the cable route with sections, slopes, bends...
Posted on 2018-02-27
The service reliability of a cable systems depends not only on the quality of the cable itself, but also to a large extent on the methods used and the care taken in laying the cable. In this blog...
Posted on 2018-01-21
A concentric cable has a conductor around the core for a return path. DC cables may be of concentric type as is the case in an integrated return conductor cable, where the return conductor is...
Posted on 2018-01-20
With the web-based cable calculation software Cableizer.com you can calculate the current rating of cables crossing external heat sources. It allows to calculate the current rating or temperatures...
Posted on 2017-01-15
Continuously validating Cableizer is a task we take serious. Our extensive test suite is a supportive tool to verify our calculations after modifications in the formulas or solver routine.
Posted on 2017-01-14
DC Fast Chargers are designed to charge electric vehicles quickly with an electric output ranging between 50 kW – 120 kW, like the Supercharger from Tesla. At a typical 400 volts, this results in...
Posted on 2016-09-02
Calculating the ampacity of a cable system correctly starts with the precise modeling of the cable. The user shall be able to model a cable as close to reality as possible, visually, electrically...
Posted on 2016-08-16
Using the Neher McGrath method for the calculation of the rating of buried cables under cyclic loading conditions allows for a daily, weekly, and yearly load factor in the same calculation.
Posted on 2016-07-03
For single-core cable circuits with sheaths solidly bonded at both ends and possibly at intermediate points, the circulating currents and the resulting losses increase as the spacing increases,...
Posted on 2016-06-26
Phase splitting can be used to drastically reduce the magnetic fields of buried power cables. Also, the conductor cross-section can be less than half because the current is only half per split...
Posted on 2016-06-06
Meet the Cableizer team at CIGRE session 2016 at the Palais des Congrès in Paris, France
Posted on 2016-06-06
For the calculation of the rating of buried cables under cyclic loading conditions two main methods are used: The method according to IEC 60853 and the Neher McGrath method. The following post...